A

Slider

" });
Theme images by kelvinjay. Powered by Blogger.

POLITICS

OPINION

ENTERTAINMENT

TECH

SCIENCE

HEALTH

TRAVEL

» » Putting Cai Mep Thi Vai into the international transit center


Deputy Prime Minister Trinh Dinh Dung said Cai Mep port complex-Thi Vai port to the international movement of goods, contributing to the socio-economic development of Ba Ria-Vung Tau and the southern key economic .

23-7 day, Deputy Prime Minister has led missions to inspect and survey activities of Cai Mep Thi Vai port complex, Ba Ria-Vung Tau Province.


According to Ba Ria-Vung Tau (BR-VT), the locality has 57 projects planned seaport, was put into operation 28/57 projects, with a total investment of about $ 2 billion; total capacity of 98.9 million tons / year, the total berth length of 11.6 km.


Deputy Prime Minister Trinh Dinh Dung and inspection missions to Cai Mep-Thi Vai - Photo: Spring Line
Deputy Prime Minister Trinh Dinh Dung and inspection missions to Cai Mep-Thi Vai - Photo: Spring Line
Private-Cai Mep Thi Vai has 35 projects planned, has now put into operation 17 projects, including 7 container terminals, docks 3 and 7 dedicated port fuel synthesis, bulk, with total capacity of about 93 million tons / year.

The container terminal at Cai Mep-Thi still be invested over 27,000 billion VND, in operation since 2009 with a total capacity of 6.8 million TEUs on / year, the total berth length 4km.

Cai Mep port complex-Thi Vai port complex is the only one in Vietnam with trains direct parent container Europe, the Americas without transit through third countries. Weekly trains 20 mothers with more than 80,000 DWT size, including 2 flights on 160,000 DWT size. This is one of the largest container ships in the world and also the largest ships ever to call Vietnam.

No comments: